Lakeside Corporate Center at PenMar Announcements/News

Infrastructure

Water and Sewer

Warner Construction maintains the fresh water system which consists of one 300,000 gallon reservoir and one million gallon reservoir; the latter being located at Lakeside. The aquifers are self-contained and produce 275,000 gallons of water per day.

Washington County offers the wastewater treatment at an off-site location.

A dam between the two lakes

A dam between the two lakes of Lakeside

Electric Propane Gas Telecommunications Water and Sewer Roads Air Transportation